0800 433 367

Completed Projects

Read about IS Dam Linings completed projects

Kopeopeo Canal

Cleaning and regeneration of the Kopeopeo canal has been a significant project for the Bay of Plenty that I.S. Dam Lining is proud to be part of.

View This Project
A dam of two halves

A Central Otago dairy farm conversion required adequate water storage for pasture irrigation during the drier months. The initial project involved lining a dam at the end of a naturally occurring stream, flooding the down hill valley.

View This Project
Hampton Downs Landfill

Hampton Downs Landfill is New Zealand's largest and most advanced landfill servicing the Auckland, Waikato and Coromandel areas. Situated on 360 hectares of farmland and developed in stages, the landfill will eventually cover an area of 87 hectares.

View This Project
Fonterra Pahiatua Wastewater Storage Ponds

Fonterra’s Pahiatua site, the Mangamutu Dairy Factory, processed 1.4 million litres of milk each day from farms across Northern Hawkes Bay to Southern Wairarapa and Wellington. The two dryers converted milk into 55,000 tonnes of whole milk powder each year. That was before Project Leonardo.

View This Project
Irrigation and dam give peace of mind

For new cherry growers Jenny Roberts and her daughter Alex, the combination of an irrigation system and a leak-proof dam was needed to give them surety of water supply for their new orchard development.

View This Project
New farm dairy effluent system future proofs business

Installing a farm dairy effluent system that complied with national standards to future proof their business was the aim of Masterton dairy farming couple Blair and Deanne Percy.

View This Project
Pond blowout results in total revamp

A dramatic overnight effluent pond blow-out left Putaruru dairy farmer Jack Scheres quickly scrambling to find a solution.

View This Project